Testimonials

Testimonial: Butler Manufacturing Letter
This is to acknowledge that Butler Manufacturing has furnished more than 30 metal building projects (over 1,200,000 square feet of roofed area) to Park Avenue Construction, Ltd., who has been using the Hi-Tech Tilt™ wall composite system on these buildings for the past 9 years. These Hi-Tech Tilt™ wall panels have been applied in both load bearing and non-load bearing conditions. To date Butler Manufacturing has not received any negative feedbacks or complaints on any of these projects.

Click here to view Butler Manufacturing letter of recommendation

Testimonial: Design Velocity Enterprises, LLC
In my experience as and architect for the last 29 years, I have always been on the lookout for new and innovative ideas for construction methods. “Hi-Tech Tilt” has impressed me and many of my associates tremendously. With the market as volatile as it is right now, time and cost is more than just a concern, and more than a requirement for consideration, it is mandatory. With “Hi-Tech Tilt” these requirements have become much easier to achieve. With the ease and simplicity of construction of these walls, time and cost are the benefits. So much so that one of our key clients, “Goodwill Industries of San Antonio” have made it almost a mandatory requirement in construction of there new retail centers. With the time and cost savings there retail center have become almost instant money makers. In closing I highly recommend “Hi-Tech Tilt” for any commercial project and would endorse it without hesitation.

Sincerely,
Manuel Berroteran

Reference: Hi-Tech Tilt
To whom it may concern:

This is to bestow the total and complete satisfaction of the Hi-Tech Tilt Product.
We have had fantastic results with the system; we are now using the product on as many building applications possible. We attribute our company recent success and growth directly to the Hi-Tech Tilt System. Other advantages that I can support without doubt are as follows:

• Construction time from job to job has been reduced significantly – as little as 15% and as much as 30% depending on type and size of project.

• Significant savings with both labor and materials have also been achieved and that has allowed us to be very competitive.

• The product due to its lighter weight yet tilt-up appearance has provided the architectural flexibility that our designers always look for.

• The product has been builder friendly, allowing us to cut out retrofit openings where needed and flexible enough to make changes as we are building in some of the cases.

• We have also eliminated the need for pour strips in our foundations. This avoids bringing the site and foundation subcontractors back to simple monolithic pours.

• The big bonus is the metal studs in place to full heights; this allows us to run all utilities and insulate warehouse buildings cost effectively, providing an energy efficient building.

• “Hi-Tech Tilt” has answered many questions that always came to mind when I used traditional tilt-up methods, questions like: why so much rebar, why so much concrete, why so many embeds, why so large cranes, why so long before we can erect panels, etc.


These are just a few impacting features and advantage that “Hi-Tech Tilt” brings to the table to say the least.



Best Regards,


John J. Valle
Park Avenue Construction, Ltd.
Manager


Testimonial: INTERNATIONAL TRADELINK GROUP, LC
Por medio de la presente, nos permitimos recomendar ampliamente a la constructora Park Avenue y a su representante el Sr. John J. Valle y así mismo agradecerle todas las atenciones que tuvieron y siguen teniendo con nosotros, ya que actualmente estamos instalados en nuestra bodega, la cual cuenta con 161,293 pies cuadrados de almacén, como también oficinas que disponen de 13,900 pies cuadrados adicionales (distribuidas en tres niveles). Nuestra empresa, International Tradelink se siente orgullosa de ser propietaria, ser vanguardista, y haber participado con Park Avenue en este proyecto. Dicho proyecto se encuentra ubicado en 12013 General Milton Dr; En el parque Industrial Killiam, en la Ciudad de Laredo, Texas. El monto total de esta construcción fue de: $ 5,200,000.00 dlls

Siempre es agradable estrenar instalaciones nuevas, bien construidas con acabados finos y estar a la vanguardia, ya que fue construida con el sistema más innovador del momento "Hi-Tech™ Tilt" (muros de concreto con aislamiento), acompañado del pionero y líder de naves industriales marca Butler (dicha nave ya se ha comprobado en las tormentas recientes).

Consideramos que Park Avenue Construcción, es una empresa seria y confiable, a la cual le deseamos el mejor de los éxitos en sus futuros proyectos.

Lic. Mario Dominguez
Presidente

Ing. Luis Hurtado
Vicepresidente

Testimonial: LNT TRADING INC
We would like to express our warm congratulation to you for your completion of the commercial and warehouse building for us. We are particularly delighted that by using the new technology you have completed the building within the six months, which met our tight schedule as expected. Now, our workforce has more open spaces, fresh and comfortable environment to work with. The facility and quality are remarkable. Our sincere thanks also express to your wife Raquel for her strenuous efforts in assisting us in interior decoration, which allowed us to expedite the completion of the project and resulted the early moving in to the newly built commercial and warehouse.

Kevin Chiang
Manager

Testimonial: BODY FACTORY FITNESS CLUB
By this means I really appreciate and thank you for convincing me into using the Hi-Tech™ Tilt wall system on my new building. Since the beggining of the construction I was very satisfied and impressed by the considerable amount of time saving in constructing the building. I would also like to mention to you that I've received many compliments on the building; I think that my building as well as Reinhardt's building has had a positive impact on the commercial surrounding being brought up-on Jacaman Road. Once again I would really like to thank you for your support in advising me during the construction.

Jose Manuel Valdez

Testimonial: THE LAREDO NATIONAL BANK
This is to inform you that The Laredo National Bank is satisfied with the full and partial outcome (since two of them are in different construction stages) of the projects we have financed using the Hi-Tech™ Tilt Wall System. Our loan customers, whose projects have or are in the process of being finished with this system, appear to be satisfied with their project's time and process. Additionally, the product that you have introduced to our market area appears to be cost effective and customers welcome the apparent savings when compared to the conventional tilt wall. The inside wall insulation factor also appears to play an attractive role in their decision making.

Rolando Negrete
Vice President

Testimonial: SPRING CREEK PLAZA
May this letter serve not only to congratulate you but also to recognize you for such a fine commercial building that you built for us. We were and continue to be impressed by the Hi-Tech™ construction system and Butler Roofing System used in the construction of our building. TO this date we continue to receive compliments on our building. Besides the quality of the building your availability during and after construction was greatly appreciated.

I sincerely believe we were able to sell our units so quickly because of the new building technology used and over all quality of the construction.

I am looking forward to working with you on our next contruction endeavor.

Armando Garcia
Managing Partner

Testimonial: REINHARDT PLAZA
This is a letter which explains my complete satisfaction of the building solution which was used in our Reinhardt Plaza building and one in which I can recommend your company with amplitude.

Although, the metal building and other uncontrolled factors put a hamper on our construction schedule, it has been your wall panel (Hi-Tech™ Tilt) which saved the day. I'm pleased to say that the overall project is of great quality, we have received so many compliments on the design and quality of the building, and "that" I believe is added value. I know that our building is 90% complete at this time but with anticipation and no hesitation my general point of view is "thumbs up".

On a different note we are negotiating some acreage in the active South side of town area and hopefully we'll be discussing another design built project very soon.

Once again we believe that the Butler Building together with your new Panel system has been a winning combination for us.

Carbell Reinhardt
President

Testimonial: RPMI
We have just successfully used the Hi-Tech™ Tilt system in the construction of a 4-story self-storage facility in Forth Worth, Texas. Being our first experience with the system, we were amazed at just how easily the system met our needs and exceeded our expectations. Having an extensive background in conventional tilt wall applications, I was amazed at how fast the product went up, saving us a lot of time, and letting construction of the interior commence much faster. As you well know, time is money.

We have now decided to use this system on our upcoming projects, and look forward to carrying forward the success we enjoyed on the first project we used this system. We have delivered an excellent product to an enthusiastic customer, and as a company who prides itself on customer service, I can and do strongly recommend the Hi-Tech™ Tilt system to anyone building projects of all shapes and sizes. We are excited about the future of this system.

Jeff Eubank
Vice President - Operations
Director of Design

    TCA Tilt-Up Concrete Association
    American Society of Concrete Contractors
    US Green Building Council