Rio Grande Valley Assembly Hall

Click here to view the Rio Grande Valley 58,000 SF Assembly Hall Overview The overview includes
  • Steel Frame Erection Process
  • Pre-Engineered Steel Frames
  • HTT Panel Layout on Slab
  • Pouring Concrete in HTT Panels
  • HTT Poured & Ready to Lift
  • Enclosing Main Hall
  • Main Building & Lobby Erection Processes
  • Sprayed Insulation, Framing & Exterior Prep for Finishes